Fira de Barcelona and IFEMA set a reaction-to-fire class (UNE-EN 13501-1) for walls, ceilings and floors. Our fire-retardant board is B-s1,d0 and our carpet Bfl-s1. Both are accepted at every venue, including IFEMA's Palacio Municipal, which is the strictest.
| Venue | Walls and ceilings | Floor | Height | Deadlines |
|---|---|---|---|---|
| Fira de Barcelona, Gran Via | C-s2,d0 (UNE-EN 13501-1) §1.4, p. 6 | Efl §1.4, p. 6 | 5 m, and 4 m in some areas. Above that, a complex structure with a technician §3.3.1 and §3.4 | Stand plans in advance, and services two weeks before build-up §3.3, §5.1 and §6.4 |
| Fira de Barcelona, Montjuïc | C-s2,d0 §1.4, p. 6 | Efl §1.4, p. 6 | 5 m. Above that, a complex structure §3.3.1 | Not stated |
| CCIB | Not stated | Not stated | Not stated | Not stated |
| Fira de Girona | Nothing easily combustible. No Euroclass specified art. 26.2 | Not stated | 2.50 m, and up to 4 m for custom-built stands art. 28, 29 and 33 | Stand plans approved before build-up, and works two weeks before art. 27 and 33 |
| IFEMA, IFEMA's own shows | C-s2,d0 (UNE-EN 13501-1) §19, p. 20 | Efl §19, p. 20 | 4 m, and a single feature up to 6 m on the perimeter §25, p. 21 | Dimensioned stand plans a month before build-up. No approval, no build §25, p. 21 |
| IFEMA, externally organised shows and Centro de Convenciones | C-s2,d0, although the risk annex of the same document says B-s1,d0 §19, pp. 11, 35 | Efl, although the annex says Bfl-s1 §19, pp. 11, 35 | 4 m in the Centro de Convenciones Norte §24.3, p. 12 | Not stated |
| IFEMA, Palacio Municipal | B-s1,d0 §19, p. 21 | Bfl-s1 §19, p. 21 | 4 m in the multi-purpose space and 3 m elsewhere §25.2, p. 23 | Dimensioned stand plans, a month before build-up §25.1, p. 23 |
| Feira Internacional de Galicia | Must meet the fire prevention by-law. No Euroclass specified art. 30 | Not stated | 4 m, 6 m set back 1 m and 7 m on two storeys with certified drawings art. 38 | Stand plans, 30 days before the opening art. 37 |
| Expourense | Fire-retardant construction, fabrics and carpets. No Euroclass specified Materiales de montaje | Not stated | 3 m at the front. Above that, with approval and set back 1 m Altura máxima | Not stated |
Every stand comes with its spec sheet, listing the material of each element, its fire class and its certificate, for the build-up paperwork and for your company's report.